1.0 Scope of Inquiry
The hotel project in Riyadh provided an opportunity to evaluate the impact of value engineering (VE) and explore how a more proactive Value Management (VM) approach could have enhanced project outcomes. In the course of the project, VE was applied at RIBA Plan of Work Stage 4, after the design had been finalized and construction was underway. The VE exercise was aimed at identifying cost-saving opportunities without compromising the quality or functionality of the project. The savings were achieved through changes such as alternative fireproof coatings, adjustments to substructure waterproofing materials, and revisions to the mechanical, electrical, and plumbing (MEP) specifications. The cost-saving measures ranged from SAR 13.4 million to SAR 20.4 million, reflecting substantial savings potential as shown in table 1 below.
These are tabled below for consideration by DGCL for further negotiation and agreement with the recommended bidder, or as a post contract variation. No. | ||||
Identified Value Engineering Opportunity | Bidder 1 | Bidder 2 | Bidder 3 | |
1 | Application of cementitious fireproofing coating (to a similar acceptable specification) to columns, beams and trusses in concealed areas. | -469,200.00 | -1,031,931.83 | -2,144,520.00 |
2 | Cold applied bituminous paint of appropriate specification in Substructure waterproofing in lieu of the specified Waterproofing. | -2,289,701.00 | -8,723,090.37 | -11,735,136.44 |
3 | Additional cost for CMU (Concrete Masonry Unit) in lieu of adobe block. | -2,283,762.00 | -710,045.44 | 5,682,515.83 |
4 | Concrete change in mix specifications | -658,753.00 | -1,635,771.62 | -2,400,923.45 |
5 | MEP value engineering proposal schedule | -7,790,455.00 | -8,387,155.15 | -3,017,531.53 |
6 | Roof waterproofing changed to combo roofing system | -444,717.00 | Not Offered | -223,885.62 |
Total (Incl. VAT) | -13,936,588.00 | -20,487,994.41 | -13,839,481.21 |
Table 1: Cost Saving Opportunities
This reactive VE process, however, raises an important question: could these cost-saving opportunities have been identified and implemented more effectively earlier in the project lifecycle? This is the primary focus of my inquiry. By shifting to a Value Management (VM) approach applied at the start of the project, it is possible that a more strategic and value-focused framework for decision-making could have been established. VM that aims at enhancing value by ensuring that objectives are, cost, quality and functionality aligned at an early stage could have offered a more integrated approach with regards to selection and specification standards of materials. Originally VM would have provided a better option of decision making during the conceptual along with the design phases meaning that VE measures would not have to have been so reactive at the subsequent phases.
The inquiry also looks at the disadvantages of the reactive VE which typically happens once there is enough progress to compromise the project schedules, costs, and quality. For instance, the post-bid savings approach in items like fireproof coatings and other waterproofing materials may bring a number of compromises in to the system which in turn can affect the project wrongfully. Due to the need to make decisions and keep within certain budget expectations, these kinds of reactive decisions may call for optimal solutions which are often based on the cost instead of making choices that are best for the project in terms of value for money ad performance over time.
From the literature on VM and risk management, the following implications provide understanding of how such challenges could be tackled at advanced stages of the project life cycle. Had the project considered VM concepts including function analysis, cost consideration, and identification of stakeholders, the project could have concentrated on value optimization, cost, function and performance with minimal compromise on many of the principles. In addition, had the risk management techniques been incorporated within the initial developmental stages, it may have been possible to prevent the emergence of conditions that could lead to cost overruns or unexpected alterations in direction by assessing critical risk factors at an early stage and formulating plans which could reduce the effect of such a factor on the overall development of the project .
The purpose of this report is to investigate how VM at the initial stages might have affected the result identified in the VE exercise and to elaborate the shortcomings of reactive VE and how using proactive approach could eliminate those problems. Thus, answering these questions, the report will give understanding of the further purposes of VM and risk management in relation to project goals and expenditures for its economical usage. The research results could prove useful as a reference in enhancing future project performance, as far as value creation, project cost, and overall success is concerned.
2.0 Literature Review
2.1 Introduction
This literature review elaborates Value Management (VM) and Risk Management frameworks
Related Papers
(Solution) CIPD 7C004 Task 2.1 Differences of Primary and Secondary Data
(Solution) CIPS Royal Commission for Alula (RCU) Developing Contracts in Procurement and Supply -PDC
(Solution) CIPS Advanced Level Contract & Category Management in P&S – APGM
- This business report has been used for evaluating the category and contract management in Eco2Solar Company.
- In particular, Eco2Solar operates to improve their project management (PM) and Cost Management (CM) as part of their category management has been evaluated.
- The areas of focus has included an evaluation of requirements for initiating and preparing category management, strategic and conventional sourcing process and role in contract management, tools and techniques for mapping categories of direct and indirect expenditure.
- From the findings obtained, innovative measures for improving the supply chain in light of categories and category management has been recommended.
- Further, in this business report, the contract administration and contract management in case of category management has similarly been evaluated in context of category management this is with assessment of risks and implementation of risk management techniques in contracts being reviewed in context of category management.
- In order to appreciate the best practice in category and contract management in the selected Eco2Solar construction spend area, use of quantitative and desk research has been pursued to obtain relevant data.
- Additionally, different tools have been applied such as Mendelow Stakeholders analysis, CIPS Category Management Cycle, CIPS Contract Management Cycle, Suppliers positioning, PESTLE analysis and SWOT analysis.
- Considering this business report findings, Eco2Solar need to improve their approach for risk management and efficiency and effectiveness of category and contract management.
- From these finding, the stakeholders collaboration in Eco2Solar need to be improved which can be done by embrace of blockchain technologies.
- Also, by identifying their PS&M teams training and capacity development, they would be able to improve on their category management. In the contemporary procurement environment, the training and capacity development has been noted as the best practice to manage gaps in their operations. Also, the findings indicate the need for Eco2Solar to improve their category management of their construction spend by coming up with appropriate SLA’s agreement and KPIs while ensuring they capitalise on innovativeness.
- For the project management and cost management, this being a long-term investment would require an improved auditing. This can entail embrace of analytics to analyse and present contract management data and appropriate management strategy.
- The importance of improved collaboration is ensuring stakeholders active involvement and awareness on core decisions made as this could harness their practice, contribution and suggestions noted.
- By successfully pursuing stakeholder analysis, it is important to maintain stakeholders relations which promote Eco2Solar organisation image and increase their market share.
(Solution) Oakwood International 5CO03 Task Two – Professional Review
(Solution) Assessment ID / CIPD_7CO02_24_01 Question 10 (AC 3.2) nature of ethics and professionalism in people practice
(Solution) CIPS Red Sea Global Module: Developing Contracts in Procurement and Supply (PDC)
- A review of risks management approach integrated to the terms and conditions
- Develop a clear approach for agreement with different suppliers for managing “battle of the forms”
- To use various KPI’s and reports to implement contracts
- To reconstitute how innovation and technologies are included in implementing contracts
- To enhance scope of understanding and awareness regarding the contract terms and conditions