Description
Solution
Email 6: 3.2 Legal Requirements for Redundancy Process
As you consider implementing the reorganisation within your directorate, it is essential to fully understand the legal requirements surrounding redundancy.
1. Identification of Reasons for Redundancy
Redundancy can be defined as situations where posts are no longer needed for one reason or another for instance closure of a business, downsizing or diminutive of the organization’s requirements for employees. As for redundancy, the most predominate act of law is the Trade Union and Labour Relations (Consolidation) Act of 1992, referred to as TULRCA. TULRCA 1992 provides clear guidance such as eligibility for redundancy and process pointing out that the reason for redundancy is must be valid, non-discriminatory, and objectively justified (Bakermckenzie, 2025).
2. Stages in the Process
The redundancy process involves several key stages:
Selection for Redundancy: This is because it is based on such factors as merit and fitness (skill, experience and performance). It must also not favour one party over the other, in other words it has to be impartial. Larger redundancy situations Applying this provision where the proposed dismissal relates to 20 or more employees, other regulations under TULRCA 1992 with regard to collective consultation with unions or employee representatives apply (Bakermckenzie, 2025).
Consultation: Employers have to consult the employees who will be affected or their representatives. These include detailing why redundancy is necessary, looking at options and potential solutions to this (like a transfer).
Notice and Redundancy Pay: Proper notice should be provided to the employees before redundancy comes into operation depending on the years of service. They are also redeemable for redundancy and for this they are paid according to their age, contract duration, and weekly wages (Gov.Uk, 2024).
3. Information on Consultation Requirements
Consultation is a legal requirement under TULRCA 1992. Where 20 or more redundancies occur within a 90-day period,…
Please click herein to access this assessment in full
Related Papers
(Solution) CIPS Emirates Transport Company Strategic Supply Chain Management SSCM
- This assessment has focused on evaluating the supply chain map in Tyres spend category in ETC organisation.
- The relevance of this has been to enumerate the extent in which their supply chain is characterised by strengths and weaknesses as it influence the scope of the stakeholders interaction.
- Successful evaluation and eventual development of supply chain is core as it note on stakeholders visibility, ethical-best practice, risk management and costs reduction.
- Strengths identified to be associated with the 2-tier supply chain entail a high-level collaboration, cost reduction and managing time appropriately.
- ETC is found to gain from a high-level positioning in UAE Transport sector. This is with their innovation increasing since supply chain is integrated with technology use.
(Solution) CIPS New APCE Advanced Category Management
- In summary, this assignment has focused on evaluating the source of power and risk of an organisation contractual terms. This has been conducted through the focus of SSMC organisation which is currently being engaged in procurement of first aid materials.
- Through a series of analysis, the power and risk distribution has been evidenced as varying in different phenomenon to SSMC and their engaged suppliers. The rationale of this is that for the success of a contract, the legal provisions are critical among the involved parties with clearly set requirements to be adhered to or abstained.
- By using different tools including supplier preferencing matrix, Porter’s 5 forces and Turn-key model have been adopted for this research.
- It has been established that in most instances, SSMC has the power with majority of the risks being held by the supplier. An evaluation of the different components of the contract has been conducted with the clauses of interest including costs, quality level, time for delivery and ethics which influence the power and risk of the suppliers.
- From the analysis of stakeholders by use of the Mendelow stakeholder’s matrix and SWOT analysis, the various issues and risks represent the noted issues in procurement of the fast aid and safety measures in today COVID-19 pandemic.
- As evidenced in the Kraljic analysis, various contract terms are of strategic relevance to SSMC which affirm on its approach of holistically leveraging on contractual risk and power.
- Where the SSMC lacks a holistic balance on the risks and power, a warrant or insurance is granted for guaranteeing their safety.
(Solution) 3C004 CIPD Explain each stage of the employee life cycle and the role of the people professional in it. (AC1.1)
(Solution) CIPD 7C004 Task 4.3: Reflective Analysis
(Solution) New PSE Sourcing Essentials ROSHN Syndicate Cohort
- ROSHN should incorporate Porter’s Five Forces and PESTLE analysis into the organization’s Vendor Management Team (VMT)
- The expansion of the approved list of suppliers by not less than fifteen percent in the course of the next year is vital in eliminating reliance on a few suppliers.
- Improving eSourcing tools especially eAuctions to apply competitive pressures and lower costs of procurement. This will solve the problem of inefficiency in the tendering process and increase transparency while RHOSN already has efficient technology solutions for engaging suppliers.
- Obligatory implementation of a supplier sustainability program that identifies suppliers with high levels of CS