(Solution) 5CO01(AC2.4) Discuss models to show how change is experienced
In order to demonstrate the experience of change in an organisation, Kubler Ross Change Curve Model can be referenced (Lindblad, 2022). Initially, this model was meant to guide the grieving/mourning session. These experiences are identified as including denying, angry, bargain, depressed and accept.
Denial– This experience entail the employees feeling that the change is not necessary. A case example is where the hybrid working change program would be perceived as a change to take jobs from some of the employees. Also, it could be viewed as a practice of eliminating some of the privileges offered to the employees.
Anger– In change, experience could be emotional after termination of the denial stage. It is possible to feel frustrated with the change process particularly in regard to losing their jobs due to issues of flexible working provision.
Bargaining– In bargaining process, this stage entail employees being provided with an opportunity to negotiate for their input in the hybrid working program.
Depression– In the hybrid working implementation, depression mean they are unsure on their role in the hybrid working process implementation (Lukianov et al., 2020).
Acceptance– This stage means the employees accept the hybrid working arrangement as important to them. This is while supporting the process and recommending areas of improvement to be part of their culture.
Emotions, Behaviours and Positives Impacts of Change
In the identified phases, employees evidence a set of feeling and practices. To begin with, they gain a feel of need to be aggressive leading to absenteeism in their roles or failing to be enthusiastic to work in teams. In regard to benefits, Lindblad (2022) highlight employees gaining from being resilient, flexible and actively taking part in their operations.
The positives of the change strategy is inclusive of effective collaboration with the rest of the organisation employees. Through a two-way feedback being enhanced and points of concerns increased, working in a flexible environment would be enhanced. Similarly, awareness by the various entities which support the staff by emotional wellbeing lead to challenges with performance.
Please click the following icon to access this assessment in full
Related Papers
(Solution) CIPS PDV Saudi Aramco Market Analysis; Procurement Function Produce Value for Money
(Solution) CIPD AVADO_5HR02_24_06 5HR02 Talent Management and workforce planning
(Solution) CIPD AC 1.3 Process of case settlement before and during formal legal procedures
(Solution) CIPS ADNOC APGSS impact of market changes on the supply chain
(Solution) New CIPD Avado 5C003- Professional Behaviours and Valuing People Assessment
(Solution) CIPS FIDIC Contracts Advanced Practitioner Corporate Award (APCE)
- In this report, an evaluation of a contract by Oracle which is FIDIC guiding their construction projects in more than 67 countries globally has been carried out.
- It is evident from the analysis that there are varying contractual terms having an influence on the power and risk distribution between a supplier and an organisation.
- The rationale of this is that a contract is a legally enforceable agreement between different parties with specific acts or practices to be put into account.
- The core report areas of focus of focus has included the issues of price, quality, construction projects delivery timeline and health and safety have been put into account on the extent in which the risk and power are distributed between the contractor and the organisations.
- In the components identified, it is evident that irrespective of whether the buyer or supplier executes the risk or power.
- Through the application of different tools such as Mendelow stakeholders matrix, SWOT analysis and others, distinct issues and risks characterised by various challenges in the construction projects execution with their mitigation approaches and risks have been evidenced.
- As evidenced from the Kraljic analysis, it is evident that contractual terms have a strategic relevance in the context of Oracle informing on their holistic leveraging on the risks and powers of the contract.
- In situations where Oracle fails in leveraging on contract holistic risks power balance, warrant and also insurance cover is used.